Pathways - Ability to move nodes around once populated
under review/backlog
R

Rochelle Ramirez
Merged in a post:
Editing a Pathway
J

Jordan Walsh
McKinsey has requested the ability to be able to move a node at the end of a pathway over without impacting the rest of a pathway. As it current stands - if you have 4 nodes horizontal and then later need to add a node at the far right - you would have to drag everything to the left in order to add that final node. They are requesting the ability to be able to add a node to the far right without having to drag everything over.
R

Rochelle Ramirez
updated the status to
under review/backlog